Bio |
VRX Silica regards the Arrow smith North Silica Sand Project as its most advanced project. Production of the project is scheduled to begin in 2023. https://colitco.com/vrx-silica-limited-is-all-set-for-the-arrowsmith-north-silica-sand-project-signed-power-loi-with-resourceswa/
|